Business development - Consultation
Concept Development (CD)
-
Conceptual design supplement
-
Revise layout & land use plan
-
Revise perspective rendering
-
Preparing technical solutions
-
Detailed material list
-
Presentation within 20 days
Basic Drawing for Permit
-
Preparation for permission
-
Site layout & Land use plan
-
Floor plan, Elevation & Section
-
Landscaping plan
-
Submit within 20 days
-
Consulting permission process
Detailed Cost Estimate
-
Reflecting CD & basic drawings
-
Breakdown for detailed works
-
Building cost analysis
-
Cost control within Pre-FS
-
If over, provide its solution
-
Submit within 10 days