Concept Development (CD)

 

♦ Conceptual design supplement

♦ Revise layout & land use plan

♦ Revise perspective rendering

♦ Preparing technical solutions

♦ Detailed material list 

♦ Presentation within 20 days

 

Basic Drawing for Permit

 

♦ Preparation for permission
♦ Site layout & Land use plan
♦ Floor plan, Elevation & Section
♦ Landscaping plan
♦ Submit within 20 days
♦ Consulting permission process

 

Detailed Cost Estimate

 

♦ Reflecting CD & basic drawings

♦ Breakdown for detailed works

♦ Building cost analysis

♦ Cost control within Pre-FS  

♦ If over, provide its solution

♦ Submit within 10 days